
Build
Adding a separate structure or a purpose-built room to your property is a significant investment, and the details matter — from foundation and framing to insulation, electrical,…
About Build
Adding a separate structure or a purpose-built room to your property is a significant investment, and the details matter — from foundation and framing to insulation, electrical, and the finish work that makes the space actually usable. Whether you need a rentable ADU in your backyard, a proper workshop with the right floor load and ventilation, or a home gym built to handle real equipment, we handle the full scope of construction under one roof. Getting this work done right the first time means fewer problems down the road and a structure that holds its value.
Why Choose Us
- Permit-ready construction — we handle Austin's ADU permitting requirements and code compliance from the start, so nothing gets built that has to be torn out later.
- Built for its actual purpose — layouts, structural details, and mechanical rough-ins are planned around how you will use the space, not adapted from a generic plan.
- Single point of accountability — one contractor manages design coordination, subcontractors, inspections, and final walkthrough, so nothing falls through the cracks between trades.
Why Choose Us for Build
Permit-ready construction — we handle Austin's ADU permitting requirements and code compliance from the start, so nothing gets built that has to be torn out later.
Built for its actual purpose — layouts, structural details, and mechanical rough-ins are planned around how you will use the space, not adapted from a generic plan.
Single point of accountability — one contractor manages design coordination, subcontractors, inspections, and final walkthrough, so nothing falls through the cracks between trades.
Ready to Start Your Build?
Get a clear proposal, honest timeline, and superior results. Let's build something great together.
Build FAQs
Have more questions? We're here to guide you every step of the way.
Contact UsA detached ADU typically takes four to seven months from permit submission to final inspection, depending on size, site conditions, and current city review timelines. We give you a project schedule at the start and flag any changes as they come up. Prefabricated or smaller structures can move faster, but permit review timelines in Austin are the biggest variable outside our control.
Costs vary considerably based on square footage, foundation type, finish level, and utility connections. A straightforward detached workshop will land at a different price point than a fully finished ADU with a kitchen and bathroom. We provide detailed, itemized estimates before any work begins so you know exactly what you are agreeing to.
We start with a site assessment and a conversation about how you plan to use the space, then move into design and permitting before any ground is broken. Once permits are approved, construction follows a set sequence — site prep, foundation, framing, mechanical rough-ins, insulation, drywall, and finishes — with inspections at the required stages. You will have a consistent point of contact throughout and regular updates on where the project stands.
We build with standard residential-grade materials that meet or exceed Austin building code, and we are straightforward with you about where spending more makes a long-term difference and where it does not. Yes, you can select your own finishes — flooring, fixtures, cabinetry, and similar items — within the scope we agree on. If you have a specific product or supplier in mind, let us know early so we can plan around lead times.
Our workmanship is warranted for one year from the date of substantial completion. Manufacturer warranties on materials, fixtures, and equipment pass through to you directly and vary by product. If something related to our work comes up after move-in, contact us and we will come take a look.
